Updates
484th Bomb Group – Pilot Fliimsies
The Pilot Flimsies were issued to each crew prior to the mission.
They contained all the virtual information needed for the mission ...
They contained all the virtual information needed for the mission ...
Antietam Order of Battle
THE ARMY OF NORTHERN VIRGINIA General Robert E. Lee, CSA, commanding LONGSTREET'S CORPS (Maj. Gen. James Longstreet) McLaws' Division (Maj. Gen. Lafayette McLaws)
- Kershaw's Brigade (Brig. Gen. Joseph B. Kershaw)
- 2nd South Carolina ...
- 2nd South Carolina ...
Rodbuilding
I decided to try my hand at building a fly rod this year. Did a lot of reading on the web and purchased a couple of used books off Amazon. Plus some advise from a ...
Rusty Nail (10’ 10” 6 Weight Switch–2 piece)
I built this rod from a 10’ 6” 7 weight single handed blank I got from Utmost on closeout. I think it is a Pac-Bay blank but not sure. This was my first rod build ...
Green Machine (10’ 4” 3/4 Switch – 4 Piece)
I built this rod from a Roger Penrose single handed 10’ 3/4 weight blank. I extended the length by 4 inches and added a 2 handed grip. The guides are single foot with ceramic inserts ...
Micro Camper Build Phase #3
Micro Camper Finishing Galley and Interior After getting in sealed and painted, I started work on finishing the interior and the galley. During my build I got away from the original plan to keep it ...
Micro Camper Build Phase 2
Applying Poor Man's Fiberglass and Paint After getting the framing done and deciding on windows I started the process of covering it in Poor Man's Fiberglass (PMF). This method uses wood glue, canvas, and lots ...
Micro Camper Build Phase 1
Initial Planning (or lack of) and Framing After selling my last RV, I decided to attempt a DIY build for a micro camper. I wanted this for a couple of reasons:
- Travelling between snowbird ...